Request list for heavy power using devices.

WARNING: Request page for NUTS will be closed at 30 July 2025 @ 13:00 CET

We will process all requests that are been made before this date and time. All other (late) requests will be handled at the event if possible.

Heavy power request list

On the event there are different pieces of equipment that requere power most of them are your normale 1 phase 16A schuko plug.
But for al those devices that require more power, 3 phase 16A and up (those red CEE plugs) we want to know about those so it can help us plan the grid.
So please fill out the form below with the equipment you have that is more then ~9KW (3 phase 16A red cee plug) and up.

If you have any questions mailing list: nuts@lists.why2025.org

example

EXAMPLE!

List of requests
Team location equipment power usage and plug type note Nuts approval nuts note
Team:Waste boneyard garbage compactor 3 phase 16A CEE to get rid of carbage - -
Team:Productiehuis main stage stage power 3 phase 200A powerlock power for main stage - -

EXAMPLE!

request list

List of requests
Team location equipment power usage and plug type note Nuts approval nuts note
Team:Productiehuis Andromeda AV + LED wall 2x 63A CEE + break-out Way more than consumed but large headroom needed
Team:Productiehuis Brachius AV + displays 1x 63A CEE + break-out Way more than consumed but large headroom needed
Team:Productiehuis Cassiopeia AV + displays 1x 32A CEE + break-out Way more than consumed but large headroom needed
Team:Productiehuis Delphius AV + displays 1x 16A CEE + break-out Way more than consumed but large headroom needed
Team:Productiehuis Workshop Euclid AV + displays 1x 16A CEE + break-out
Team:Productiehuis Workshop Fobos AV + displays 1x 16A CEE + break-out
Team:Shuttle Parking area BEV Charging 40kWp, 63A CEE topping up Shuttle vans (5 cars) Including charge infrastructure for up to 8 connections
Team:NOC Datacenter 4x7KW air conditioning 28KW ,32A CEE with breakout cooling Datacenter -
Team:NOC Datacenter servers 2x 32A CEE seperate feed with breakout servers -
Team:NOC NOC computers 1x 16A CEE with breakout computers -
Team:NOC Datenklo (56x) switches 1x 16A schuko, no shared RCD/FUSES, prevent going down. if datenklo if not beside a power point a extension cord is needed. can this be supplied by NUTS?
Village:DutchPicknick Village:DutchPicknick Kitchen equipement, lights, audio equipment, beamer, stagelights, power for sleeping places, cooling trailer, servers 1x 3x400V+N 32A CEE Provide 60 residents with an enjoyable WHY2025 and we have our own distributionpoints from 32A/400V to 3x 230V (L1/L2/L3) for use inside the village You can plug into PD 125#17
Village:Squirrel (Brussels) Village:Squirrel (Brussels) Multiple various equipments, deep fryers, and servers 1x 3x400V+N 32A CEE Break-out box provided + 20 m of 32A extension cord You can plug into PD 400#13
Team:On-site_transportation LSD Electric Telehandler normal charge 3 kW (240 V / 16 A) blue CEE, quick charge 18 kW (415 V / 32 A) normal charge might be enough, maybe quick charge if needed at shuttle charging area. Spec sheet -
Team:Safety-Fire Safety village AC, hot water Stopcontact 230V 2x vrije groep (2x CEE 230V/16A) Housing 'afkoelruimte' -
Team:Safety-Fire Safety village AC, Nighttime-Cooking, washing machine, hot water Stopcontact 230V 2x vrije groep (2x CEE 230V/16A) Housing 'piketdienst' -
Team:Safety-Fire Safety village AC, hot water Stopcontact 230V 2x vrije groep (2x CEE 230V/16A) Housing 'centrale post' -
Team:Safety-Fire Safety village hot water Stopcontact 230V 1x vrije groep (1x CEE 230V/16A) Firt-aid tent -
Team:Volunteers Heaven hot water & kitchen equipment A lot (details will follow) Induction cooking plate, steam ovens, lighing for big tent, 4 workspaces, 2 tables with outlet Heaven -
Team:Volunteers Heaven cool container As early as possible, day -6 2 cooling containers Koelcontainer naast heaven -
Team:Warehouse Warehouse 4 portacabins 1x 32A red uplink, 3x 32 A short link (assumption! to be confirmed with rental company) will probably only use <5 kW in practice; at most twice that, when it's very cold or hot Change of plans: we will use more power than previously indicated; 3x32 A still suffices but we will actually use more (because of charging 2 gators) -
Team:Foodcourt Foodcourt Foodtrucks & cooling container 67kW Peak usage, 9 trucks, cooling container (13kW 32A CEE) Total: 13x 16A groups. 4x 32A CEE - -
Team:Bar Bar Foodcourt (+ backstage) Bar equipment ~54kW 4x32A CEE + 12x 16A group See Team:Bar page for full table. -
Team:Bar Bar Main Stage Bar equipment ~27kW, 1x32A CEE 5-Pole + 8x 16A group See Team:Bar page for full table. -
Team:Bar Bar Arcade Bar equipment ~30kW, 1x32A CEE 5-Pole + 9x 16A group See Team:Bar page for full table. -
Team:Ticket_&_Entrance Entrance Charging laptops, lamps 5x Stopcontact 230V distrib. over two tables in 5by10 tent -
Team:CTF CTF Tent Workspaces for 75 visitors + lighting (led), a fridge, water cooker, popcorn machine, toaster & networking equipment All normal 230v sockets We provided a floorplan via email. We have been in contact with Team:Warehouse as well, which pointed us back to you. -
Village:WOC Pagode Tent WOC Power for Waffle irons, fridges, ice rolls, kitchen stuff in the WOC Village… ~20kW 12x230V Schuko - -
Project:Arcade Arcade tent 50 Arcade cabinets and pinballs, lights, projectors etc. About 20kW total, maybe a little bit more. All machines use schuko. - -
Team:PartyArea PartyArea Lights and Audio equipment 100kW Peak usage (during evening hours), 3x 32A CEE for Lights (located on/under stage) 2x 32a for Audio (located on/under stage) total: 5x 32A CEE - 125A + distribution
Team:Waste LSD Trash compactor 5,5kW, 400V 32A stekker afzekeren: C 25A Will be on the field from 01-08 until 14-08 13/14-8 with mobile generator?
Team:Waste Foodcourt Trash compactor 5,5kW, 400V 32A stekker afzekeren: C 25A Will be on the field from 01-08 until 14-08 13/14-8 with mobile generator?
Village:Area42 Area42/Cluster D42D Kitchen equipment, lights, audio equipment, power for sleeping places (incl. some medical stuff), etc. 31KW Peak (most likely during early morning hours and late afternoon for cooking activities), 1x 63A CEE (we will distribute further down ourselves) - -
internal tents tracks, workshops, family, heaven Long thick industrial extension leads +schuko in the past, we rented a few m3 of these tbd -
Village:ChaosFurs tbd Village distribution (smoke machine, single induction cooker, partylights, audio, small fridge, projector) 32A/400V (we have our own distribution box and have 32A/400V and 16A/400V out to daisy chain to next box if needed)
Village:Food_Hacking_Base Food Hacking Base village Kitchen equipment, cooling trailer 32A/400V we have our own distribution box and have 32A/400V and 16A/400V out to daisy chain to next box if needed You can plug into PD 125#24
Village:Yolocation Popup datacenter for Free VMs Datacenter and server equipment 32A / 400V CEE We have our own fused distribution box to 6x16A 230V 7/8-13/8 You can plug into PD 400#16
Team:productiehuis all track tents power on day -4 - - tbd On priority list; no guarantee
Project:Sauna Sauna near Village:Salmiakki, map link Sauna stove + hacktent + tents 1x 32A CEE (we split it with own distribution box to 3x16A for sauna and 3x16A to rest) You can plug into PD 125#16
Village:ANDERSTORPSFESTIVALEN Bar right of event party bar PA, Bar equipment, fridges 1x 32A / 400V CEE (we have our own distribution box), we also power ornhack from that dist. If possible we'd like power from day -2 (5th) You can plug into PD 125#14
Cluster:Chaos_Norden_Westen_Osten_+_Austria Chaos DACH cluster next to Datenklo M11 kitchen equipment, networking equipment, uplink for Yolocation, lights and audio 1x 32A CEE If possible we'd like power from day -2 (5th) You can plug into PD 400#16
Village:Nbsp Violet Field Domes and Dome accessories 2x 3 phase 16A CEE email if there are issues; 32A 3P or multiple seperate phases may be doable You can plug into PD 400#16. Warning: We don't have 16A CEE. You should go for the 32A CEE.
Village:Milliways Milliways Cluster south of food court 2x Cooling Trailers, JungleDome, lighting, DJ Booth, Kitchen Equipment and more 2x 32A / 400V CEE (we have our own distribution boxes) If possible we'd like power from day -2 (5th) You can plug into PD 125#13
Village:Back_to_the_80s_Party Village Back to the 80s Party Audio, kitchen equipment, cooling, party lights, overhead projector, beamer, laptops, pinball machine 3 phase 400V 16A CEE (we have our own distribution box) You can plug into PD 125#17. Warning: You don't have 16A CEE. Only 32A CEE available
Village:Hardware_Hacking_Area Village Hardware Hacking Area 80 soldering irons (30W each), 10 lamps (25W each), 40 laptops (200W each) ~10KW, Schuko You can plug into PD 63#16.
Village:ZTL Village ZTL Lights, Fridge, Induction Cooker, Oven, Soldering Equipment 3 phase 400V 16A CEE (we have our own distribution box) distribution box has additional CEE socket for further distribution + we bring 10m of cable but could bring more if necessary) You can plug into PD 400#12. Warning: We don't have 16A CEE. Only 32A CEE. You need around 25M of length.
Village:SHA512 Village SHA512 Lights, Fridge, Induction Cooker, Soldering Equipment, Microscope and other hardware hacking equipment 3 phase 400V 16A CEE (we have our own distribution box) You can plug into PD 125#20. Warning: There is no 16A CEE. Only 32A CEE available.
Team:POC POC Fridge, Freezer, Deepfryer, Oven, DECT (A LOT), Lights, Projectors, Computers 1x 16A CEE (we use our own distribution box) We need at least Basic Power on 02. August You can plug into PD 125#19. Warning: There is no 16A CEE. Only 32A CEE available.
Village:Energy Village Energy Lights, Fridge, (Water)Cooker, Soldering Equipment, Computers, Projectors, Networking 3 phase 400V 16A CEE (we have our own distribution box) You can plug into PD 125#12. Warning: We don't have 16A. Only 32A CEE.
Village:Entropolis Village Entropolis Lights, Fridge, Electric / Induction Cooker, Coffee Machine, Kettle, Soldering Equipment, Computers, Projectors, Networking, 3 phase 400V 16A CEE (please provide distribution box if possible) You can plug into PD 400#15. Warning: We don't have 16A. Only 32A CEE.
Village:Green_Ninjas Village Green Ninjas Space for ~60 people (20 villagers + 40 visitors, during self-hosted talks in the day) with laptops + 3 TV Screens + Lighting (led), a fridge, a coffee machine & networking equipment If possible, multiple normal 230v sockets Email if any questions. No requirements before Day 0 (7th). Maybe the heavy power request is unnecessary? You can plug into PD 63#16. Enough Schuko available.
Village:POC Village poc laptops 2x 230V Schuko - This is not a heavy power request. Just connect to one of the PD's. (125#19)
Village:ne2000 Village cyan kitchen appliances, laptops, artwork, etc. 10kW peak usage expected. Schuko plugs only, please provide a distribution box, especially if we need to pass-through to the tent-free space near us. - This is not a heavy power request. Just connect to one of the PD's.
Village:/dev/lol Village /dev/lol Lights, Projectors, Computers, laptops, artwork, kitchenstuff etc. 10kW peak usage expected. 1x CEE 400V 16A (max. 8kW power requirement) for our own distribution box You can plug into PD 400#13. Warning: We don't have 16A CEE. Only 32A CEE.
Village:Frubar Village Frubar DMX Lights, Soundsystem, LED Wall, Retrocomputers (PDP11), Fridge, Kitchen & Bar equipment, Computers for ~40 villagers 1x 32A/400V CEE (we have our own distribution box) You can plug into PD 125#16. You need around 35M of cable.
Village:Geraffel Village Geraffel Lights, 3 * Fridge, (Water)Cooker, Beer Cooler, Soldering Equipment, Computers, Projectors, Networking 3 phase 400V 32A CEE (we have our own distribution box) You can plug into PD 63#04.
Village:HackTheHealth Village HackTheHealth Lights, 2 * Fridge, Various bits of equipment to hack and be hacked. 3 phase 400V 32A CEE (we have our own distribution boxes and cable) We are next to Village:DutchPicknick and Village:Back_to_the_80s_Party. Power is only needed from day 0. You can plug into PD 400#10
Village:Code_for_Heilbronn Village Code_for_Heilbronn Kitchen equipement, Lights, Power for Hackcenter, cooling trailer 3 phase 400V 32A CEE (we have our own distribution boxes) - You can plug into PD 400#15.
Village:Flying_Objects Village Flying_Objects Cooling trailer, Kitchen equipement 3 phase 400V 32A CEE (we have our own distribution boxes) - You can plug into PD 400#10
Village:Area42 The Ring of Fire Art installation, heaters, pump, ignition 3 phase 400V 32A CEE including Distribution box if possible You can plug into PD 125#15
Symfony of fire tesla coils and flame trowers You can plug into PD 125#15