Request list for heavy power using devices.
Heavy power request list
On the event there are different pieces of equipment that requere power most of them are your normale 1 phase 16A schuko plug.
But for al those devices that require more power, 3 phase 16A and up (those red CEE plugs) we want to know about those so it can help us plan the grid.
So please fill out the form below with the equipment you have that is more then ~9KW (3 phase 16A red cee plug) and up.
If you have any questions mailing list: nuts@lists.why2025.org
example
EXAMPLE!
| Team | location | equipment | power usage and plug type | note | Nuts approval | nuts note |
|---|---|---|---|---|---|---|
| Team:Waste | boneyard | garbage compactor | 3 phase 16A CEE | to get rid of carbage | - | - |
| Team:Productiehuis | main stage | stage power | 3 phase 200A powerlock | power for main stage | - | - |
EXAMPLE!
request list
| Team | location | equipment | power usage and plug type | note | Nuts approval | nuts note |
|---|---|---|---|---|---|---|
| Team:Shuttle | Parking area | BEV Charging | 40kWp, 63A CEE | topping up Shuttle vans | ✅ | Including charge infrastructure for up to 8 connections |
| Team:NOC | Datacenter | 4x7KW air conditioning | 28KW ,32A CEE | cooling Datacenter | tbd | - |
| - | - | - | - | - | tbd | - |