Team:Nuts/heavy power request list

From WHY2025 wiki
Revision as of 20:41, 26 February 2025 by Killergeek (talk | contribs) (intial setup list)
Jump to navigation Jump to search

Request list for heavy power using devices.

Heavy power request list

On the event there are different pieces of equipment that requere power most of them are your normale 1 phase 16A schuko plug.
But for al those devices that require more power, 3 phase 16A and up (those red CEE plugs) we wandt to know about those so it can help us plan the grid.
So please fill out the form below with the equipment you have that is more then ~9KW (3 phase 16A red cee plug) and up.

example

List of requests
Team location equipment power usage and plug type note Nuts approval nuts note
Team:Waste boneyard garbage compactor 3 phase 16A CEE to get rid of carbage - -
Team:Productiehuis main stage stage power 3 phase 200A powerlock power for main stage - -

request list

List of requests
Team location equipment power usage and plug type note Nuts approval nuts note
- - - - - - -
- - - - - - -