Team:Deco/Synthwave Horizon

From WHY2025 wiki
Jump to navigation Jump to search


Name Synthwave Horizon
Contact Hoxolotl
Status idea
Budget 450


PVC tubes with 3D printed ball joints, colored in fluo colors to make the usual synthwave mountains and sun horizon.


Dependencies

  • TODO: Other teams needed?
    • will need some power for the backlights
  • TODO: Permits required?
    • I don't think so, it's lightweight, decor, and outside
  • TODO: Power in watts?
    • 2 blacklight TL
    • 1 beamer
    • LOTS of rgb rope, have to look into it.
  • TODO: Network? Private network required?
    • still looking into it.

Status

  • TODO:
  • cut the 4m pipes for greenhouse test
  • paint pipes
  • make a 3D render for the decor to check features.
  • cut the parts for the decor.

Howto: Prepare

  • TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
    • 5 stared spokes
  • TODO: Do volunteers require a specific set of skills?
    • nope, the system is modular joints so it's really easy
  • TODO: How many volunteers over how many hours are required?
  • 1 or 2 volunteers, total 16 hours, so 8 hours with 2 people, and less if more people help.
  • TODO: Is the preparation bound to a specific location?
    • goal is at the end of the rainbow road.
  • TODO: How much space is required to store the project before it is moved to the event site?
    • 1 euro pallet 1m high-ish

TODO: Describe the manufacturing process in the highest level of detail.

  • pick correct color tube from cart
  • pick a manual
  • start the lego-ing of parts
  • when frame is built, span canvas on it.

Howto: Buildup

  • TODO: Where is the stuff stored?
    • at my apartment
  • TODO: Should Team Logistics be involved in moving the project to the event site?
    • yes, it's quite a volume, and there is also another project with 12 beamers that needs a pick-up
  • TODO: How many volunteers are required?
    • one to two
  • TODO: How much time is required?
    • 2 days (depending on amount of help can go back to 4 hours)
  • TODO: Provide instructions on how to set up the installation on the event site.
    • unload parts
    • sort pipes depending on colors
    • build a lot of smaller parts when possible
      • like 5 pointed stars for the "sun" globe.
    • start assembly and lifting and connecting
    • add canvasses
    • lay down electrical wiring for the leds and blacklights and ( maybe) beamers.

Howto: Teardown

  • TODO: Throw/give away?
    • Maybe give away: design made for re-use =D
  • TODO: How many volunteers are required?
    • at least one, maybe two
  • TODO: How much time is required?
    • estimated 2 days build up and testing
  • TODO: How much waste in cubic meters is produced?
    • NONE... wel ok, a lot of 30cm pvc piping is left over but that won't make it to the event: cutting 75cm out of 4m parts... I might be able to optimize better, but there's a lot of pie involved.