Team:Deco/Signage
Jump to navigation
Jump to search
Note: Please request your sign before 13th of June!
| Name | Signage |
|---|---|
| Contact | Moem |
| Status | idea |
| Budget | 500 |
TODO: Provide a brief description.
Signs that will be made (no request is needed)
- toilets:
- ?x
- showers:
- ?x
- the Infodesk
- field names
- 6 x
- street names:
- tbd
- track tents:
- TBD
- TBD
- TBD
- TBD
- workshops:
- TBD
- TBD
- TBD
- supermarket
- merch sales
- first aid
- volunteers (Heaven)
- food court
- bar
- party area
Request your sign here
Please add the sign name you want to request, followed by the name of your team.
Please request your sign before 13th of June!
- CTF Team:CTF
- NOC Team:NOC
- ROC Team:ROC
- Speakerdesk Team:Content
- Cohesion Team:Cohesion
- NUTS Team:NUTS
- Warehouse Team:Warehouse
- Info (2x outside, 1x inside) Team:Info
- Badge Team:Badge
- Camper Spots Team:Terrain
- [[Team: ]]
...
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
- TODO: Buildlog...
Howto: Prepare
- TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
- TODO: Do volunteers require a specific set of skills?
- TODO: How many volunteers over how many hours are required?
- TODO: Is the preparation bound to a specific location?
- TODO: How much space is required to store the project before it is moved to the event site?
TODO: Describe the manufacturing process in the highest level of detail.
Howto: Buildup
- TODO: Where is the stuff stored?
- TODO: Should Team Logistics be involved in moving the project to the event site?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: How much waste in cubic meters is produced?