Team:Deco/Signage

From WHY2025 wiki
Jump to navigation Jump to search


Name Signage
Contact Moem
Status idea
Budget 500


TODO: Provide a brief description.

Signs that will be made (no request is needed)

  • toilets:
    • 11x
  • showers:
    • 5x
  • the Infodesk
  • field names
    • 21 x
  • street names:
    • Backbone Blvd
    • South Trunk
    • North Trunk
    • Uplink
    • Wheatstone Bridge
  • track tents:
    • Abacus
    • Battery
    • Clairvoyance
  • workshops:
    • DNA
    • Envelope
    • Family
  • supermarket
  • merch sales
  • first aid
  • volunteers
  • food court
  • bar

Dependencies

  • TODO: Other teams needed?
  • TODO: Permits required?
  • TODO: Power in watts?
  • TODO: Network? Private network required?

Status

  • TODO: Buildlog...

Howto: Prepare

  • TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
  • TODO: Do volunteers require a specific set of skills?
  • TODO: How many volunteers over how many hours are required?
  • TODO: Is the preparation bound to a specific location?
  • TODO: How much space is required to store the project before it is moved to the event site?

TODO: Describe the manufacturing process in the highest level of detail.

Howto: Buildup

  • TODO: Where is the stuff stored?
  • TODO: Should Team Logistics be involved in moving the project to the event site?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: How much waste in cubic meters is produced?