Team:Deco/Signage
Jump to navigation
Jump to search
Note: Please request your sign before 13th of June!
| Name | Signage |
|---|---|
| Contact | Moem |
| Status | idea |
| Budget | 500 |
TODO: Provide a brief description.
Signs that will be made (no request is needed)
- toilets:
- ?x
- showers:
- ?x
- the Infodesk
- field names
- 6 x
- street names:
- tbd
- track tents:
- TBD
- TBD
- TBD
- TBD
- workshops:
- TBD
- TBD
- TBD
- supermarket
- merch sales
- first aid
- volunteers (Heaven)
- food court
- bar
- party area
Request your sign here
Please add the sign name you want to request, followed by the name of your team.
Please request your sign before 13th of June!
- CTF Team:CTF
- NOC Team:NOC
- ROC Team:ROC
- Speakerdesk Team:Content
- Cohesion Team:Cohesion
- NUTS Team:NUTS
- Warehouse Team:Warehouse
- No hoarding - return everything asap Team:Warehouse
- Info (2x outside, 1x inside) Team:Info
- Badge Team:Badge
- Camper Spots Team:Terrain
- "Badge pickup @ badge tent" Team:Ticket_&_Entrance
- "Alcohol wristbands are available at INFO" Team:Ticket_&_Entrance
- "LSD (Logistics Storage Domain)", Terrain name to put on fencing. Maybe LSD in big letters, with the full name in small print or something Team:On-site_Logistics
- "LSD trip", Roadname of road to LSD Team:On-site_Logistics
- "No Entry, Logistics only", Warning sign at blocked of road. Maybe to put on a road barrier (dranghek) 2 times Team:On-site_Logistics
- "Danger: Live Flame Effects – Do Not Enter" or even better: " WARNING: STAGE FLAMES IN USE Authorized Personnel Only Beyond This Point Live flame effects in operation. High heat and fire hazard.", Warning sign on the roadbarrier (hek) on both sides of the dyke Team:Deco
...
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
- TODO: Buildlog...
Howto: Prepare
- TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
- TODO: Do volunteers require a specific set of skills?
- TODO: How many volunteers over how many hours are required?
- TODO: Is the preparation bound to a specific location?
- TODO: How much space is required to store the project before it is moved to the event site?
TODO: Describe the manufacturing process in the highest level of detail.
Howto: Buildup
- TODO: Where is the stuff stored?
- TODO: Should Team Logistics be involved in moving the project to the event site?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: How much waste in cubic meters is produced?