Team:Deco/Lecterns

From WHY2025 wiki
Jump to navigation Jump to search


Name Lecterns
Contact Moem
Status wip
Budget 500


We need 4 lecterns for speakers. We have wooden frames for the sides from SA007. Moem is planning to make these into foldable lecterns.

Dependencies

  • Other teams needed? No.
  • Permits required? No.
  • Power in watts? Very low.
  • Network? Private network required? No.

Status

  • TODO: Buildlog...

Howto: Prepare

  • TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
  • TODO: Do volunteers require a specific set of skills?
  • TODO: How many volunteers over how many hours are required?
  • TODO: Is the preparation bound to a specific location?
  • TODO: How much space is required to store the project before it is moved to the event site?

TODO: Describe the manufacturing process in the highest level of detail.

Howto: Buildup

  • TODO: Where is the stuff stored?
  • TODO: Should Team Logistics be involved in moving the project to the event site?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: Provide instructions on how to set up the installation on the event site.

Howto: Teardown

  • TODO: Throw/give away?
  • TODO: How many volunteers are required?
  • TODO: How much time is required?
  • TODO: How much waste in cubic meters is produced?