You do not have permission to edit this page, for the following reasons:
Free text:
CfA. http://aurora.blausand.net/ TODO: work the streamer into something workable == Dependencies == * TODO: Other teams needed? * TODO: Permits required? * TODO: Power in watts? * TODO: Network? Private network required? == Status == * TODO: Buildlog... <!-- Photo's get linked here --> <gallery> </gallery> == Howto: Prepare == * TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers? * TODO: Do volunteers require a specific set of skills? * TODO: How many volunteers over how many hours are required? * TODO: Is the preparation bound to a specific location? * TODO: How much space is required to store the project before it is moved to the event site? TODO: Describe the manufacturing process in the highest level of detail. == Howto: Buildup == * TODO: Where is the stuff stored? * TODO: Should Team Logistics be involved in moving the project to the event site? * TODO: How many volunteers are required? * TODO: How much time is required? * TODO: Provide instructions on how to set up the installation on the event site. == Howto: Teardown == * TODO: Throw/give away? * TODO: How many volunteers are required? * TODO: How much time is required? * TODO: How much waste in cubic meters is produced?
Save page Show preview Show changes Cancel