Team:Deco/Silent Lounge Decoration
Jump to navigation
Jump to search
| Name | Silent Lounge Decoration (duplicate, pls remove) |
|---|---|
| Contact | |
| Status | abandoned |
| Budget | 2000 |
TODO: Provide a brief description.
Dependencies
- TODO: Other teams needed?
- TODO: Permits required?
- TODO: Power in watts?
- TODO: Network? Private network required?
Status
- TODO: Buildlog...
Howto: Prepare
- TODO: Is there a part in the preparation process that can be performed in parallel by a group of volunteers?
- TODO: Do volunteers require a specific set of skills?
- TODO: How many volunteers over how many hours are required?
- TODO: Is the preparation bound to a specific location?
- TODO: How much space is required to store the project before it is moved to the event site?
TODO: Describe the manufacturing process in the highest level of detail.
Howto: Buildup
- TODO: Where is the stuff stored?
- TODO: Should Team Logistics be involved in moving the project to the event site?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: Provide instructions on how to set up the installation on the event site.
Howto: Teardown
- TODO: Throw/give away?
- TODO: How many volunteers are required?
- TODO: How much time is required?
- TODO: How much waste in cubic meters is produced?